Our Budget and Upgrades…

Below is a list of our Pricing from Tender, with an estimate of additional costs required. We paid our 3% deposit on Monday night but there was a bit of negotiation to get to this point.

We argued our site costs, as an original Soil test stated we needed a H1 slab, not H2. This got us nowhere. But we agreed to continue as long as PD agreed in writing that we would not have any additional hidden costs through the energy efficiency report. As our rear is almost north facing, and no windows had been changed, there was very little chance the costs would go up. But this is not a risk we could afford to take a this stage, as we are already over our pre approval amount. oops.

And here goes…

Base house and Site Costs = $217,874

Base cost for the Dunes 29
$186,900

Build Zone 3 Surcharge
$5,000

Excavation – Cut and Fill, Rock removal etc.
$2,921

Slab Upgrades – H2, extra Steel Reinforcement and Concrete Piers
$11,956

Services – Connection fee, additional run of Water, Trench and Ag drains
$1,604

NBN Estate Pack
$1,600

Local Government and OHS – Permits, Temp fencing and Crushed Rock
$1,945

Dispensation of Garage wall as it exceeds 3000mm
$450

BAL Requirements based on 12.5 rating
$5,498

Promotions – Total $15,797

Free Colourbond Roof
Free Bolero Flooring and Category 1 Carpet
All available Dreams Wait for No One Packs

Upgrades – Total $6,698

Double doors to Lounge Room
$382

Butlers Pantry – Provide Laminate Bench top around entire pantry, 1 x 800mm wide laminate cabinet (2doors), 450mm diameter round sink, mixer, category 1 wall tile splashback in lieu od standard pantry layout. Note, Standard laminate finish and handles.
$1,590

Provide plaster bulkhead above overhead kitchen cupboards
$220

Provide Laminex Silk Finish upgrade to kitchen cabinets and overhead cabinets in lieu of standard finish (Includes kickboards, rear and end panels)
$1,631

Category 1 Essa Stone Benchtops to Ensuite
$495

Category 1 Essa Stone Benchtops to Bathroom
$365

Telecommunications infastructure to home
$462

Add additional Square Ceiling Dumper to ensuite to make double shower (Note, will need additional mixer tap)
$448

Provide Category 2 Carpet in lieu of Category 1
$1,105

Allowances and remaining upgrades (Approx amounts only) Total $13,900

Allowance for Driveway and blinds after handover
$8,000

Electrical
$4,000

Mixer taps in lieu of standard
$400 (approx)

Upgraded front door and basic entry handle upgrade
$600

Upgrade underlay to category 3
$600

Upgraded bathtub to 1700 Decina Uno
$300

Total Build Cost of $254,269